Product
Telehealth solution for automated capture of hospital-grade measurements
Bring reliable medical-grade measurements from the hospital to the home with the Masimo Home Health Kit. Designed for patients with chronic and long-term conditions, as well as postoperative and recovering patients, the kit automates the collection of spot-check pulse oximetry, temperature, blood pressure, and weight measurements using intuitive devices and the Masimo SafetyNet App. Easily paired with the devices via Bluetooth®, the app transfers patient data to a secure cloud, where clinicians can access and analyze it using a web-based clinician portal—helping them spot which patients may need more follow up or even urgent intervention, wherever they are.

Automate Patient Engagement
Scale-up Home Monitoring

Masimo TIR-1™
Non-contact, clinical-grade infrared spot check thermometer with Bluetooth®
Body Temperature

Masimo MightySat® Rx Fingertip Pulse Oximeter
Featuring Masimo SET® Measure-through Motion and Low Perfusion™ Pulse Oximetry
Perfusion Index

Omron® Blood Pressure Monitor
Featuring Advanced Accuracy Technology to provide precise blood pressure readings less affected by breathing or movement during measurement. Comes with a wide-range cuff suitable for arm circumferences from 9” to 17”.
Blood Pressure

Omron® Digital Weight Scale
Performs smart tracking of body weight up to 550 lbs.
Body Weight
RESOURCES
See how Masimo SafetyNet: Home Health Kit can make a difference in your healthcare organization. Please fill out the following information and a Masimo representative will be in touch with you.
Caution: Federal (USA) law restricts this device to sale by or on the order of a physician. See instructions for use for full prescribing information, including indications, contraindications, warnings, and precautions.
The Bluetooth® word mark and logos are registered trademarks owned by Bluetooth®
PLCO-005059/PLM-13165A-0621